![]() |
CALL FOR PAPERSCP97 Workshop onIndustrial Constraint-DirectedSchedulingSchloss Hagenberg, AustriaNovember 1st, 1997 |
Decisions on acceptance will be sent to authors by 15th September 1997.
A list of accepted papers and postscript source can be found here
Andrew Davenport and Chris Beck (co-chairs)
Enterprise Integration Laboratory,
University of Toronto,
4 Taddle Creek Road,
Toronto, Ontario M5S 3G9,
CANADA
andrewd@ie.utoronto.ca
chris@cs.utoronto.ca
![]() |
Edward Sitarski is vice-president of research and development at Numetrix Ltd where he is responsible for all research, product development and technical direction. Over the last 8 years at Numetrix, he has released a number of integrated decision support products for the Supply Chain Optimization market. These products are used to commercially solve many diverse business planning and scheduling problems from high-level inter-enterprise analysis to short-term production/distribution coordination to second-by-second production scheduling and vehicle loading at the plant and loading dock. The software incorporates research from many areas including large scale constraint visualization, representation, mathmatical programming, constraint-directed search, simulation and portable integration. Dozens of multi-national companies rely on Numetrix products worldwide. In 1993 he was granted a patent (US #5,237,497) for a technique to perform large-scale visualization and optimization. He received a B. Math in Graph Theory from the University of Waterloo in 1988. |